- Air Conditioning Service/RepairThe Windrose project was managed by Bruce A.Wilcox, P.E. In addition to project management, Wilcox was responsible for the experimental design and analysis of the data collected. The Proctor Engineering Group verified the air-conditioning systems performance. Ed Hancock and Greg Barker of Mountain Energy Partners installed the data collection systems. Aeroseal sealed and tested the ductwork.
Products
"Fish and Chips" found in 1 dish