- Bathroom Remodeling
- Flooring
- New Construction
- Demolition
- FencingWork included site clearing, rock blasting, cast in place 12 'x 8' x 24' concrete valve vault, 12'' water main wet tap, 12'' water wet tap main to new tank, gate valves, check valve, altitude valve, 6'' drain line, interior/exterior lighting, lightning protection, fencing, backfilling, and drive way.
- Tree Removal
- Asphalt Paving
- ExcavationDescription: Replace 3500 gallon UST with new steel 3500 gallon double wall UST. Walls of excavation needed to be shored because
- Retaining WallsAll welds were x-rayed. Site restoration involved truck ramp 12'' 4000psi concrete with double mat # 6 rebar, blue stone entrance way, stone retaining walls, and hand rails.
- Irrigation SystemsDescription: Constructed new viewing gallery inside existing gymnasium. Structure consisted of new structual steel with decking and concrete floor. Three new offices and two new bathrooms were constructed on the gallery. With the new gallery were installed new lighting above and below, plumbing, electrical, fire alarm system, sprinkler system and new HVAC system. A new exterior entrance was also installed with new retaining wall.
- Residential Roof Repair
- Residential Roof Replacement/Installation